Plan: 5 milestones
Each milestone is a drivable, self-contained workshop job with its own labor line.
Budget
Ranges, not point estimates. Prepared = surveyed + 10% contingency.
Per milestone
Bar spans low to high estimate. Axis in juta Rp.
Cumulative spend
Running total after each milestone. Axis in juta Rp.
Bill of materials
Market survey , IDR. PS4 Pro and 24" monitor not included.
| # | Item | Parts | Low | High |
|---|